Skip to main content
Article
Redesigning Capacity Market to Include Flexibility Via Ramp Constraints in High-Renewable Penetrated System
International Journal of Electrical Power and Energy Systems
  • Xin Fang
  • Qinran Hu
  • Rui Bo, Missouri University of Science and Technology
  • Fangxing Li, The University of Tennessee, Knoxville
Abstract

Capacity markets can co-exist alongside the energy and ancillary markets to ensure the medium-term and long-term supply adequacy by remunerating the generation resources for their availability. With the substantially increasing deployment of renewable generation, the system needs more flexibility to quickly mitigate the variability and uncertainty caused by the renewable generation. However, the present capacity market model does not differentiate the flexibility of generating units, so it might not give appropriate pricing signals to more flexible units that are usually more expensive. This is particularly important considering the increasing penetration levels of renewable generation on the electric grid, which increases the need for flexible units. This paper proposes a novel capacity market model considering flexibility requirement (FR) under the high penetration levels of renewable generation. Therefore, the proposed model can give the market-clearing price (MCP) for not only peak load generation capacity but also flexibility requirement. Thus, flexible units will tend to receive more economic incentives than non-flexible units. In the case studies, the profitability of different generation resources under the proposed capacity market model is analyzed and compared to the present capacity market model. The results show that the proposed method can maintain system reliability with regard to both peak load and flexibility requirement efficiently.

Department(s)
Electrical and Computer Engineering
Research Center/Lab(s)
Intelligent Systems Center
Comments

National Renewable Energy Laboratory, Grant DE-AC36-08GO28308

Keywords and Phrases
  • Capacity Market,
  • Flexibility,
  • Generation Investment,
  • Solar Power,
  • System Reliability,
  • Wind Power
Document Type
Article - Journal
Document Version
Citation
File Type
text
Language(s)
English
Rights
© 2021 Elsevier, All rights reserved.
Publication Date
6-1-2021
Publication Date
01 Jun 2021
Citation Information
Xin Fang, Qinran Hu, Rui Bo and Fangxing Li. "Redesigning Capacity Market to Include Flexibility Via Ramp Constraints in High-Renewable Penetrated System" International Journal of Electrical Power and Energy Systems Vol. 128 (2021) ISSN: 0142-0615
Available at: http://works.bepress.com/rui-bo/87/