Skip to main content
Article
Importance of Pre-melt Hold Times in Very Low Oxygen Partial Pressure Silicon Sessile Drop Equilibrium Contact Angle Measurements
Proceedings of the 16th Project Integration Meeting of the Jet Propulsion Laboratory Low Cost Solar Array Project (1980: Sep., Pasadena, California)
  • P. D. Ownby, Missouri University of Science and Technology
  • Harold V. Romero
Department(s)
Materials Science and Engineering
Document Type
Article - Conference proceedings
Document Version
Citation
File Type
text
Language(s)
English
Rights
© 1980 Jet Propulsion Laboratory, All rights reserved.
Publication Date
9-1-1980
Publication Date
01 Sep 1980
Citation Information
P. D. Ownby and Harold V. Romero. "Importance of Pre-melt Hold Times in Very Low Oxygen Partial Pressure Silicon Sessile Drop Equilibrium Contact Angle Measurements" Proceedings of the 16th Project Integration Meeting of the Jet Propulsion Laboratory Low Cost Solar Array Project (1980: Sep., Pasadena, California) (1980)
Available at: http://works.bepress.com/p_ownby/153/