Recommendations for Updating the Electricity Distribution Code and Solar Plants Grid Connection Codes in Egypt
Journal of the Egyptian Society of Engineers (2021)
  • Omar H. Abdalla
  • Gamal Abdel-Salam
  • Azza A. A. Mostafa
Abstract
ABSTRACT
Electricity sector in Egypt has witnessed major developments in generation, transmission and distribution systems since 2015 due to increasing renewable energy integration, electric vehicles and electricity market reform. As a result, codes and standards have to be updated to guarantee secure and reliable operation of current and future power system. This paper suggests recommendations for updating the Egyptian electricity distribution code and solar power plants grid connection codes via a comparison among technical requirements for corresponding codes in other countries. The major similarities and differences among electricity distribution codes are clarified. Then, a detailed comparison of solar power plants connection codes is presented. The comparison includes voltage and frequency deviations, active and reactive power control, power factor control and fault ride through. Finally, proposed recommendations to update the Egyptian codes are listed.
Keywords
  • Electricity Distribution Code,
  • Technical Requirements for Connecting Solar Systems to Grid,
  • PV systems,
  • Distributed Renewable Energy
Disciplines
Publication Date
Summer 2021
DOI
https://egsen.journals.ekb.eg/article_210013_892fa7f495696118ce69946ae2b3c9ec.pdf
Citation Information
Omar H. Abdalla, Gamal Abdel-Salam, Azza A. A. Mostafa: “Recommendations for Updating the Electricity Distribution Code and Solar Plants Grid Connection Codes in Egypt”, Journal of Egyptian Society of Engineers, Vol. 60, Issue 2, pp. 6-13, 2021. https://egsen.journals.ekb.eg/article_210013_892fa7f495696118ce69946ae2b3c9ec.pdf