Skip to main content
Article
Potential Economic Impacts of Zebra Mussels on the Hydropower Facilities in the Columbia River Basin
Center for Lakes and Reservoirs Publications and Presentations
  • Stephen Phillips
  • Tim Darland
  • Mark Sytsma, Portland State University
Document Type
Technical Report
Publication Date
2-1-2005
Subjects
  • Columbia River Watershed -- Introduced mollusks -- Control,
  • Columbia River Watershed -- Introduced organisms -- Effect on hydroelectric power plants,
  • Zebra mussels -- Environmental aspects
Disciplines
Abstract

The purpose of this study was to estimate costs to the Federal Columbia River Power System hydroelectric projects in the event of a zebra mussel infestation.

Description

Prepared for the Bonneville Power Administration

Persistent Identifier
http://archives.pdx.edu/ds/psu/4798
Citation Information
Stephen Phillips, Tim Darland and Mark Sytsma. "Potential Economic Impacts of Zebra Mussels on the Hydropower Facilities in the Columbia River Basin" (2005)
Available at: http://works.bepress.com/mark_sytsma/21/