Predicting Project Performance in the Construction Industry
Journal of Construction Engineering and Management
  • Rayan Assaad
  • Islam H. El-adaway, Missouri University of Science and Technology
  • Ibrahim S. Abotaleb
Abstract

Regardless of the different project characteristics in the construction industry, cost and schedule overruns are always regarded as being of paramount importance in the project controls area. Numerous research efforts have been directed to forecast the aforementioned two important project variables using different modeling techniques. However, no prior work is believed to have offered an integrated approach to estimating the performance of construction projects. This critical knowledge gap is compounded even more by the evolving complexities and uncertainties in today's construction industry. This paper creates a holistic framework to evaluate project progress and to predict its performance by incorporating a broad spectrum of inputs. The objectives are to (1) quantify the impacts of the risks related to the performance of projects in terms of cost and schedule; (2) formulate a holistic assessment model; and (3) correlate the developed system to predict cost and time at project completion. To this end, a multistep research methodology was utilized. First, for data collection, a survey was distributed and filled by 63 construction experts to study the effects of 25 performance risks that have shown to be the most important based on a meta-analysis of the literature in a previous study. Second, mathematical and statistical analysis techniques were used to develop a model that maps the investigated project risks to both cost and schedule performance. Steps included fitting parametric and nonparametric distributions, calculating cost overruns, verifying the model, and providing guidelines for using the proposed model. Third, for application, a hypothetical dataset was used to demonstrate the use of the model, its ability to deduce real-world behavior patterns, and associated limitations. The developed framework contributes to the body of knowledge by providing a novel model that improves project performance in terms of prediction, control, management, analysis, and decision making based on an individualized assessment of different risk indicators. This study is valuable for the construction industry because it allows all stakeholders to evaluate the performance of construction projects based on a list of variables, ultimately ensuring more effective and efficient delivery and execution of projects.

Department(s)
Civil, Architectural and Environmental Engineering
Research Center/Lab(s)
Center for Research in Energy and Environment (CREE)
Keywords and Phrases
  • Construction projects,
  • Holistic frameworks,
  • Individualized assessments,
  • Integrated approach,
  • Nonparametric distribution,
  • Project characteristics,
  • Project performance,
  • Research methodologies
Document Type
Article - Journal
Document Version
Citation
File Type
text
Language(s)
English
Rights
© 2020 American Society of Civil Engineers (ASCE), All rights reserved.
Publication Date
5-1-2020
Publication Date
01 May 2020
Citation Information
Rayan Assaad, Islam H. El-adaway and Ibrahim S. Abotaleb. "Predicting Project Performance in the Construction Industry" Journal of Construction Engineering and Management Vol. 146 Iss. 5 (2020) ISSN: 0733-9364; 1943-7862
Available at: http://works.bepress.com/islam-el-adaway/99/