Crack Development in Ternary Mix Concrete Utilizing Various Saw Depths
InTrans Project Reports
  • Kejin Wang, Iowa State University
  • Peter Taylor, Iowa State University
  • Halil Ceylan, Iowa State University
  • Jiong Hu, Iowa State University
  • Fatih Bektas, Iowa State University
Document Type
Report
Publication Date
2-1-2009
Abstract

Early entry sawing applies sawing earlier and more shallowly than conventional sawing and is believed to increase sawing productivity and reduce the cost of the joint sawing operations. However, some early entry sawing joints (transverse joints) in Iowa were found to experience delayed cracking, sometimes up to 30 days. A concern is whether early entry sawing can lead to late-age random cracking.

The present study investigated the effects of different sawing methods on random cracking in portland cement concrete (PCC) pavements. The approach was to assess the cracking potential at sawing joints by measuring the strain development of the concrete at the joints using concrete embedment strain gages. Ten joints were made with the early entry sawing method to a depth of 1.5 in., and two strain gages were installed in each of the joints. Another ten joints were made with the conventional sawing method, five of which were sawed to a depth of one-third of the pavement thickness (3.3 in.), and the other five of which were sawed to a depth of one-quarter of the pavement thickness (2.5 in.). One strain gage was installed in each joint made using conventional sawing. In total, 30 strain gages were installed in 20 joints.

The results from the present study indicate that all 30 joints cracked within 25 days after paving, though most joints made using early entry sawing cracked later than the joints made using conventional sawing. No random cracking was observed in the early entry sawing test sections two months after construction. Additionally, it was found that the strain gages used were capable of monitoring the deformations at the joints. The joint crack times (or crack initiation time) measured by the strain gages were generally consistent with the visual observations.

Comments

CTRE Project 08-317

Copyright Owner
Iowa State University
Report Number
IHRB Project TR-587
Granting Agencies

Iowa Highway Research Board, Iowa Department of Transportation

Language
en
File Format
application/pdf
Citation Information
Kejin Wang, Peter Taylor, Halil Ceylan, Jiong Hu, et al.. "Crack Development in Ternary Mix Concrete Utilizing Various Saw Depths" (2009)
Available at: http://works.bepress.com/halil_ceylan/170/