Articles «Previous Next»

A Multi-Kanban Model for Disassembly

Surendra M. Gupta, Northeastern University
Gun Udomsawat, Northeastern University
Sagar V. Kamarthi, Northeastern University

Article comments

Originally published in the Proceedings of the 2003 Northeast Decision Sciences Institute Conference, Providence, Rhode Island, pp. 169-171, March 27-29, 2003

Abstract

In this paper we demonstrate how kanbans can be used in a disassembly line setting. Disassembly line is quite different from assembly line in terms of material movement, demand arrival and inventory level fluctuation. We discuss these differences and introduce the concept of a multi-kanban mechanism to cope with them. With the help of a simulation model (developed using the ARENA software), we show that the modified kanban mechanism is in fact an effective tool for a disassembly line setting. An example is presented to illustrate the concept.

Suggested Citation

Surendra M. Gupta, Gun Udomsawat, and Sagar V. Kamarthi. "A Multi-Kanban Model for Disassembly" Gupta Publications (2003).
Available at: http://works.bepress.com/gupta/116



Share